Al Kifah contribution to the country's infrastructure is most notable in projects such as this . Project C-02 had multiple challenges due to the detailed specification of the royal commission and the drawings involving a total of 6 holding tanks for irrigation and potable water along with their necessary pumps . These challenges were tackled in quarterly meetings that truly brought together the brightest engineers and managers in al-kifah and the industry as a whole. This truly demonstrate the essence of teamwork on multiple levels of management in the project and in the head office. The total area of the buildings is 3,568 m2 with a total capacity of 213,000 m3 for the water tanks and a total cost of 259,891,487 SAR